70% reduction of a surveyors time onsite from the digitalisation of a construction project

Our clients are seeing savings of up to 70% of a surveyors time onsite using the survey grade accurate 2D/3D digital as-build data from drone technology and our cloud based platform for collaboration and analysis.


From one platform all data relating to a project can be analysed allowing various teams and stakeholders to visualise the entire project and make actionable decisions.


Within 24 hours of capturing the data of a construction or infrastructure project the system generates an accurate as-built digital twin that helps developers, contractors plus the onsite and offsite teams better manage construction projects.


Users can compare between project phases, visualise change and work done, control quality, discover deviations from plan and much more.



Recent Posts
Archive
Search By Tags