Construction project using drones to survey, track, monitor and measure earthworks and stockpile

We were out at first light this morning to beat the heat carrying out a 3D topographical survey using drone technology on a construction project


Our client is using the survey grade accurate 3D point cloud tied to the OS grid to monitor, track and measure this large earthworks project. They are comparing the as-build vs design layers and as-builds over time.



Recent Posts
Archive
Search By Tags